Construction
specialist

Our profile
is general
construction

Our most significant work within the industry was in high-rise construction, including the construction, modernization and renovation of residential buildings, offices, villas, historic buildings, institutional, industrial, logistics and commercial buildings.

Company info:

BULLDOZERIC Kft.
Registration number: 01-09-325430
VAT reference number: 26347963-2-41
Company number: 11A97721
HQ: 1053 Budapest, Szép utca 4.
Executive director: Bálint Parti

Capacity offer

Our special technical solutions, the use of modern technologies and a high level of engineering expertise together result in a dynamic increase in the number of our satisfied customers and quality references.

For legal and safe work, we provide an accountable technical manager, a construction manager, an occupational safety and accident coordinator and construction installation insurance for the same amount as the construction.

Our goal is to win the trust of our customers with quality workmanship and thus to establish and maintain a long-term partnership.

ISO certificates:
  • ISO 14001:2015
  • ISO 9001:2015
  • ISO 45001:2018
Facility security clearence
certificates:
  • Nemzeti TBT
  • EU TBT
  • NATO TBT
Image 1 Image 2 Image 3 Scroll down

Ongoing
constructions

Project photo

World Athletics Championships 2023 (Budapest XIII.)

preparation site, renovation of the athletic training field

Project photo

International Headquarters (Budapest, Pasaréti út)

Villa building rehabilitation

Project photo

FTC Groupama Arena (Budapest, Üllői út)

Implementation of a 499 kW solar panel system

Details

FTC Groupama Arena (Budapest, Üllői út)

Technical description

Implementation of a 499 kW solar panel system

Technical description

Implementation of a 499 kW solar panel system

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Project photo

BHSE Basketball Hall (Budapest, Dózsa György út)

Complete roof replacement with structural reinforcement

Details

BHSE Basketball Hall (Budapest, Dózsa György út)

Technical description

Complete roof replacement with structural reinforcement

Technical description

Complete roof replacement with structural reinforcement

...

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Project photo

Marcali Hyaluronic acid factory (MILLER Industry Hungary Kft.)

Complete general construction of a greenfield investment

Details

Marcali Hyaluronic acid factory (MILLER Industry Hungary Kft.)

Technical description

Complete general construction of a factory hall on 2150m2

Manufacture of woven and non-woven, sterile and non-sterile surgical products for hospitals and other health care facilities.

Technical description

Complete general construction of a factory hall on 2150m2

Manufacture of woven and non-woven, sterile and non-sterile surgical products for hospitals and other health care facilities.

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Project photo

General Olympic Center of Balaton (Balatonvilágos)

Complex energetic modernization

Project photo

Residential building (Budapest XII.)

Full-scale energetic modernization covering all disciplines, with internal architectural renovation

Completed constructions

Project photo
Open Photo gallery

Condominium, Csaba utca 22.

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Job verification

Condominium, Csaba utca 22.

Conservation renovation of the roof and facade of a protected building

Customer's name
Budapest Capital XII. Municipality
Completion time
05/07/2022 - 10/11/2022
Place of completion
XII. Budapest, Csaba utca 22.
Technical description

Complex energy modernization of a 9408 m2 floor space facility

  • Facade scaffolding construction (1218 m2),
  • interior stand construction (55 m3),
  • demolition of the existing roof shell,
  • renovation of the roof structure by a strict wood protection expert opinion (450 m2),
  • sheet metal covering with RHEINZINK prePatina blue-gray sheet (260m2),
  • small element sheet metal covering, RHEINZINK NM400 rhombus (200m2),
  • complete repair of the facade surface, silicate painting (1500m2),
  • repair and high-pressure sandblasting of natural stone plinths (2500m2),
Project photo
Open Photo gallery

Budapesti Honvéd SE Athletic Hall

Job verification

Budapesti Honvéd SE Athletic Hall

Complete renovation of athletic hall by covering all disciplines

Customer's name
MNV Zrt., BHSE
Completion time
29/07/2020 - 29/07/2022
Place of completion
XIII. Budapest, Dózsa György út 53.
Technical description
  • Replacement of tread copolite glazing on 606 m2, installation of new doors and windows;
  • installation of roof insulation with a new roof layer order (2010 m2);
  • facade insulation (1811 m2), high element equitone fiber cement board cladding on facade;
  • complete modernization of the heating center, insulation of pipelines on a total of 756 meters;
  • installation of an entrance control system;
  • installation of indoor and outdoor luminaires (224 pcs);
  • development of camera and alarm system (integrated into an existing system);
  • construction of comfort ventilation with ventilation technology system;
  • scaffolding on 2350 m2;
  • complete modernization of outdoor and indoor rainwater piping on a total of 600 meters;
  • construction of lightning protection;
  • installation of solar panels and collectors;
  • painting and puttying (1522 m2);
  • tinning works (572 m2);
  • design of locksmith works, canopies, brackets, attics (350 m2).
Project photo
Open Photo gallery

Gerevich Aladár National Sports Hall (I. phase)

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Job verification

Gerevich Aladár National Sports Hall (I. phase)

Complex energy modernization

Customer's name
National Sports Hall
Completion time
21/10/2020 - 19/05/2022
Place of completion
1146 Budapest, Istvánmezei út 35.
Technical description

Complex energy modernization of a 9408 m2 floor space facility.

  • Renovation of the roof structure, retrofitting, replacement of the air handling unit and replacement of external doors and windows;
  • sheet metal demolition on 2150m2;
  • replacement of edging, rafters, slats, roof decking on 2150m2;
  • slab contraction joints made of galvanized steel, VM ZINC, with duct system replacement on 2150m2;
  • replacement of doors and windows, demolition of copolite glass structure, installation of Wicona 65 evo heat bridge-free aluminum wing curtain wall on 300m2-;
  • installation and configuration of solar system (56,12kWp);
  • installation of an air handling unit with 40,000 m3 / h air transport.
Project photo
Open Photo gallery

Gerevich Aladár National Sports Hall (II. phase)

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Job verification

Gerevich Aladár National Sports Hall (II. phase)

Complete renovation by covering all disciplines, preservation work

Customer's name
National Sports Hall
Completion time
08/03/2022 - 19/08/2022
Place of completion
1146 Budapest, Istvánmezei út 35.
Technical description
  • Basement slab reinforcemnet on 500m2, with full reinforced concrete installation;
  • Further wrecking work with partition wall (441m2), facing wrecking on 683m2, professional separation of mechanical electrical and ventilation equipment, connection of the remaining utility system;
  • Ensuring and maintaining the smooth operation of the facility, during wrecking and preservation work;
  • Subsequent insulation of closing slab with inflatable bulk glass wool (145m3);
  • Aluminum structures, curtain wall assembly, installation on 363m2;
  • Facade pipe-stand deployment on 2090m2.
Project photo
Open Photo gallery

I. Varázskorona Nursery School

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Job verification

I. Varázskorona Nursery School

Complete renovation covering all disciplines

Customer's name
Budapest Capital XVI. District Municipality
Completion time
01/07/2020 - 23/10/2020
Place of completion
1161 Budapest, Szent Korona u. 53-57.
Technical description

Thermal insulation of the facade of the kindergarten, thermal and water insulation of the flat roof, modernization of the heating system and electrical network, comprehensive renovation of the 640 m2 area, with the creation of partially new premises.

  • Scaffolding: 1.310 m2;
  • Replacement of plastic doors and windows: 19 pcs;
  • Flat roof thermal insulation: 917 m2;
  • Facade thermal insulation: 1.119 m2;
  • Insulation against rainwater: 1.091 m2;
  • Replacing heating wires;
  • Radiator replacement: 142 pcs;
  • Dry construction: 127 m2;
  • Cold cladding: 250 m2;
  • Pipe cladding (PVC): 716 m2;
  • Painting: 1.097 m2;
  • Kitchen technology and food elevator installation;
  • Boiler and gas meter replacement;
  • Renovation of the water and sewerage network inside the building;
  • Renovation of strong and low current systems, installation of lightning protection.
Project photo
Open Photo gallery

Alfréd Hajós National Swimming Stadium KSI

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Job verification

Alfréd Hajós National Swimming Stadium KSI

Complete renovation by covering all disciplines, preservation work

Customer's name
Nemzeti Sportközpontok
Completion time
-
Place of completion
Budapest
Technical description

Complete renovation by covering all disciplines, preservation work

Project photo
Open Photo gallery

Family house (Budaörs)

Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Job verification

Family house (Budaörs)

Complete general construction

Customer's name
Private person
Completion time
17/08/2020 - 15/09/2021
Place of completion
Budaörs
Technical description

Complete general construction of a 400 m2 intelligent luxury house.

Please
contact us

Contact photo

General information

Contact photo

Finance

Messages sent succesfully.
We'll contact you soon.

Error while sending message. Please try again!